Find Teflon Tubes Filled With Glass Fiber, Ptfe Tubes Molded And Extruded, Filled With Black Materials Pipes on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.
Home > Products > PTFE Products > PTFE Tube > Glass fiber /bronze filled ptfe tubes
Glass fiber /bronze filled ptfe tubes
  • Glass fiber /bronze filled ptfe tubes
  • Glass fiber /bronze filled ptfe tubes
  • Glass fiber /bronze filled ptfe tubes
  • Glass fiber /bronze filled ptfe tubes
  • Glass fiber /bronze filled ptfe tubes
Payment Type: L/C,T/T,Cash
Incoterm: FOB,CFR,CIF,FCA
Min. Order: 1 Piece/Pieces
Delivery Time: 10 Days
Basic Info
Product Description

Glass Fiber /BRONZE FILLED PTFE TUBES

We can supply PTFE products filled with various other materials, such as bronze, carbon, glass fiber, and so on.

PRODUCTS FEATURES:

1.Low temperature and high temperature resistance (-190 °C- +250 °C)

2.corrosion resistance , weather resistance
3.high lubricity, no adhesion

4.non-toxic,

5.non-flammable

6.acid and alkali resistance (except molten alkali metals)

7.antioxidant.

Product specification:

Item

Specification

Outside diameter(mm)

Wall thickness (mm)

Length(mm)

Pressed Tube

1~25

0.1~2.5

As your requirement

Extruded Tube

12.4~213

1.5~15

As your requirement

Die Pressed Tube

30~2000

10~500

100~300


PTFE Filling tubes: extruded and molded , according to customer demand to fill the different proportions of variuous materials ;


MAIN PROPERTIES

Item

Unit

60% Bronze

15% Glass Fiber 5% graphite

20% Carbon Fiber

Density

g/m3

3.9

2.22

2.01

Tensile Strength

MPa

127

158

189

Elongation At Break

%

101

205

92

Rocwell Hardness

-

33.8

11.3

32.1

Friction Coefficient

-

0.18-0.2

0.15-0.17

0.16-0.18

Bending Strength

°C

280

225

320


OUR SERVICE

1)Your inquiry will be replied within 2 hours during working time,Within 24 hours when rest time.

2)Our working time is 7.30 AM --17:30 PM,Monday to Saturday.

3)General samples time can be arranged within 2--5days.

4)Orders will be produced exactly as request and approved samples.

5)When mass production,we send photos to show the production line.And confirm the estimate time again.

6)At the end of mass production,photos and samples will send to you for approval.You can arrange the inspection.

7)Before shippment,our QC will have inspection to make sure the quality.

8)We always try best to ensure every order to delivery in time.


Payment Terms

1)T/T,Cash,L/C.

2)30% deposit,70% balance before ship.

3)Lead time: 15 days after received deposited for 2 tons.

4)Delivery way: By sea,By air, By EMS,DHL,UPS,TNT,Fedex.

Packing & Delivery


For sample: By EMS,DHL,UPS,TNT,Fedex

around 5--7 working days to arrive

For Bulk order:

1.Qty of 2tons,within 15 days.

2.Via Sea

3.Delivery time:we will finish production in 15days for 2tons.

4.For 20 GP,may nee around 30days.

PICTURES OF OUR GOODS

ptfe tube


Contact us if you need more details on Teflon Tubes Filled with Glass Fiber. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Ptfe Tubes Molded and Extruded、Filled with Black Materials Pipes. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : PTFE Products > PTFE Tube